Date
|
Time
|
Location
|
Character needed
|
What is happening there?
|
15/02/17
|
4:00pm
|
Charlies bedroom
|
Charlie
|
This is where the opening scene is going to film and when
the chorus plays this is where Charlie will be lip syncing the song lyrics.
|
16/02/17
|
4:00pm
|
Quarry
|
Charlie
|
This is where Charlie will be walking and lip syncing the
lyrics whist the song plays through.
|
This is our filming schedule, we are only filming in 2 locations, this means that we will only need to film for 2 days possibly 1 day.
we will be filming in charlie bedroom first, this is because we have planned to film the opening of the music video in charlie bedroom. This is also where all of the choruses will be played swell, we will film this all in one as the bedroom may change over the course of the 2 days. if we were to divided it over the 2 days then the room could become untidy or the lighting could change which would make the music videos end product much lower. Also by doing this in the same day our actor charlie will have the same hair style which will make our video have continuity throughout.
We will then go to the quarry either the following day or on the same day, this will be to film the verses of the song. we want to get all of the filming done within 2 hours because at the time of year when we are planning to film the nights are a lot shorter and we have a very limited amount of sunlight. If we were to film this over 2 day then the shots that we take may be different due to the weather or the lighting.
If we were not to film our music video shot in close concession then the music video would have a worse look to it. This is because if we were to leave it in different parts of the seasons then lighting would have huge factor because of the time it gets dark as in summer it is lighter at 9 but in the winter it gets dark at 5, this means that we would have to plan our rime in order to makes sure that the lighting is the same throughout.